|
The Mutanda Mine is an open-pit copper mine in the Katanga Province of the Democratic Republic of the Congo. ==Location== The Mutanda Mine lies about to the southeast of Kolwezi in the Roan formation. The property is close to the national road and railway line between Kolwezi and Zambia. The Kando River runs about from the southern boundary, providing ample water. There is a good supply of electricity from the grid, with a 13.5MW standby generator. At the end of 2010 the project was employing 930 people.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Mutanda Mine」の詳細全文を読む スポンサード リンク
|